| |
General Contracting Services
- The electrical was reworked and all switches were mounted in a central location by the man door entrance.
- The attic was modified for additional storage space and ventilated by a newly installed gable mount attic fan.
- Concrete floor was repaired and covered with Gladiator rubberized roll flooring.
- Four new vinyl replacement windows were installed and the ceiling rafters were painted white.
|